• Submit Project
  • Advertise
  • NewsLetter
PA | Architecture and Technology
Courses
  • Articles
    • Archipreneurs
    • Technology
    • Bim / Aec
    • 3D Printing
    • Architects
    • Artificial Intelligence
    • Robotics
    • Sustainability
    • Tools
    • Case Study
    • City Guide
    • Opinions
    • Interviews
    • Architecture & Design
      • Urbanism
      • Metaverse
      • Space Architecture
      • Geography
  • Projects
    • Architecture
    • Interior
    • Design
      • Fashion
      • Pavilion
      • Installation
      • Digital Art
      • Landscape Design
    • Products
  • News
  • Workshops
  • PA Talks
  • Videos
  • Books
  • More
    • PA+ Membership
    • Competitions
    • Courses
    • Events
    • Jobs
    • About Us
    • Contact Us
Font ResizerAa
PA | Architecture and TechnologyPA | Architecture and Technology
Search
  • Articles
  • Projects
  • News
  • Workshops
  • PA Talks
  • Videos
  • Books
  • Advertise
  • Submit Project
  • NewsLetter
  • Contact Us
Have an existing account? Sign In
Follow US

Home - Architecture News - OMA’s New Museum Expansion in New York Balances Contrast with Continuity

Architecture NewsArchitecture

OMA’s New Museum Expansion in New York Balances Contrast with Continuity

Last updated: March 25, 2026 5:05 pm
Isha Chaudhary
Isha Chaudhary
ByIsha Chaudhary
Isha Chaudhary is an architecture writer who follows and writes about current trends and emerging discussions in architecture, with a focus on design, technology, and place-making.
Share
New Museum in New York © Jason Keen
New Museum Expansion © Jason Keen
New Museum in New York
© Jason O'Rear
New Museum in New York
New Museum in New York
New Museum in New York
© Jason O'Rear
New Museum in New York
© Jason O'Rear
New Museum in New York
© Jason Keen
New Museum in New York
© Jason Keen
New Museum in New York
New Museum in New York
© Jason O'Rear
New Museum in New York
© Jason O'Rear
New Museum in New York
© Jason O'Rear
New Museum in New York
© Jason O'Rear
New Museum in New York
© Jason O'Rear
List of Images 1/15
New Museum in New York © Jason Keen
New Museum in New York
New Museum in New York
New Museum in New York
New Museum in New York
New Museum in New York
New Museum in New York
New Museum in New York
New Museum in New York
New Museum in New York
New Museum in New York
New Museum in New York
New Museum in New York
New Museum in New York
SHARE

OMA’s New Museum in New York brings contrast and connection into a cohesive whole, as the Bowery landmark, long set apart from its surroundings, redefines itself through openness. When SANAA completed its stacked, shifting white volumes in 2007, the building quickly became an icon, distinct yet internally constrained, with tight circulation, limited gallery flexibility, and increasing program demands.

Contents
  • Why the New York’s New Museum Needed to Expand
  • A New Contrasting Form Beside the Original Museum
  • Optimizing Space for Exhibitions, Circulation & Programs
  • Engaging the Urban Context
  • New Museum Expansion Project Details

Nearly two decades later, OMA’s intervention responds by rethinking the museum as a connected system of spaces. The project reorganizes movement, expands spatial possibilities, and creates a seamless dialogue between old and new, reshaping how the building functions both internally and within the city.

Why the New York’s New Museum Needed to Expand

New Museum in New York
© Jason O’Rear

The New Museum never intended to remain static. Since its founding in 1977, it has focused on new art, new ideas, and emerging voices. Over time, its spatial limits became clear. The original building featured vertical galleries and flexible floor plans. Circulation between levels was often inefficient, and public amenities remained limited. Large-scale works, interdisciplinary exhibitions, and simultaneous programming often had to negotiate spatial constraints. 

New Museum in New York
© Jason Keen

Circulation reinforced this limitation since movement through the building followed a prescribed path, with limited visual connection between floors. Public areas remained compressed, and the threshold between street and museum lacked openness.

OMA proposed to double the museum’s capacity without erasing what already exists. The expansion project, first imagined in 2016, aimed to address these constraints while preparing the institution for future growth.

A New Contrasting Form Beside the Original Museum

New Museum in New York
© Jason O’Rear

OMA designed a distinct seven-story building adjacent to the original. It is a strategic move that allows the museum to redistribute its program. Where SANAA’s building is vertical and stacked, OMA’s addition introduces broader, more open floor plans. The new structure immediately changes the possibilities for exhibition-making. Curators are no longer bound to narrow vertical volumes, as they can now work across broader, continuous spaces.

New Museum in New York
© Jason Keen

Architect Rem Koolhaas described it as two parts forming a single institution, each with its own character yet working together. Movement becomes less constrained, more fluid, and less tied to a strict vertical sequence.

At the same time, the addition is carefully aligned with the existing building at key levels. The museum, which once functioned as a stack, begins to operate as a network.

Optimizing Space for Exhibitions, Circulation & Programs

New Museum in New York
© Jason O’Rear

One of the most decisive changes lies in how movement is organized and is more functional for exhibitions. A new atrium stair connects several levels, making it easy for visitors to move between floors while still being able to tell where they are. Additional elevators improve accessibility for all visitors, and the floor plates are intentionally flexible, so galleries can be reconfigured to accommodate different types of exhibitions.

New Museum in New York
© Jason O’Rear

These design choices resolve the original building’s limitations, transforming it from a series of isolated rooms into a fluid, connected network of spaces. Three floors of new galleries are aligned with the original structure, allowing curators to plan larger shows and more complex programming without the constraints of the previous vertical layout.

New Museum in New York
© Jason O’Rear

The expansion integrates spaces that support production, research, and public engagement. Artist studios and residency areas are embedded within the building, allowing creative work to exist alongside its presentation. The expansion gives a permanent and more visible presence to NEW INC, the museum’s incubator. A forum introduces a dedicated setting for talks, screenings, and discussions, reinforcing the museum’s position as a place of exchange. These elements shift the museum from a display space to a working cultural platform.

Engaging the Urban Context

New Museum in New York
© Jason O’Rear

The most significant changes unfold along the street-facing side, where the once-contained entrance with limited spatial generosity has been reimagined. The expansion introduces a public plaza that extends the museum outward, creating a more open, inviting approach.

New Museum in New York
© Jason O’Rear

A mesh-like glass façade references the original building while increasing transparency. This new edge establishes a clearer, more coherent entry sequence and allows the ground plane to connect the museum directly with its surroundings. It maintains a subtle continuity with the original building while increasing visual and physical permeability.

New Museum in New York
© Jason O’Rear

The project unfolded over an extended period, reflecting its complexity and the evolving needs of the institution. The project took nearly a decade from announcement to completion. Construction intensified around 2022, requiring the museum to close in 2024. Originally planned for earlier completion, the expansion finally opened to the public on March 21, 2026, marking a major milestone for the institution.

New Museum Expansion Project Details

Project Name: New Museum Expansion
Location: 235 Bowery, New York City, USA
Design Architect: OMA (Office for Metropolitan Architecture)
Lead Architects: Rem Koolhaas, Shohei Shigematsu
Executive Architect: Cooper Robertson (now Corgan)
Original Building Architect: SANAA (2007)
Project Type: Museum Expansion / Cultural Building
Completion / Opening: March 21, 2026
Total Expansion Area: 5,750m²

Image Credit: © Jason O’Rear/© Jason Keen

TAGGED:Architect Rem KoolhaasNew MuseumNew Museum Expansionnew yorkNew York’s New MuseumOMASANAA
Share This Article
Facebook LinkedIn Email Copy Link Print
ByIsha Chaudhary
Isha Chaudhary is an architecture writer who follows and writes about current trends and emerging discussions in architecture, with a focus on design, technology, and place-making.
Previous Article Sectional vs. Sofa and Loveseat: Which Is Best for Your Living Room? Sectional vs. Sofa and Loveseat: Which Is Best for Your Living Room?
Next Article Best Free & Budget-Friendly AI Tools for Architecture Students in 2026 Best Free & Budget-Friendly AI Tools for Architecture Students in 2026
Leave a Comment Leave a Comment

Leave a Reply Cancel reply

You must be logged in to post a comment.

Most Popular

The hybrid avant-garde “wearable organism” aesthetic of Siyun Huang

Articles

7 Frank Lloyd Wright houses currently up for sale

Architecture & Design

D5 2.7: Benefit from real-time rendering with AI and PCG capabilities

Tools

Mark Zuckerberg announced that Meta trained a new large language model, LLaMA

Architecture News
Apple September 2025 Event-iPhone 17 Series

What to Expect at Apple’s 2025 Event as iPhone 17 Launch Nears

Technology
UEFA Champions League, Europe’s Top Stadiums

UEFA Champions League Final Venues: The Architecture of Europe’s Top Stadiums

Architecture & Design
Designing the Future with Wood Architecture

Designing the Future with Wood Architecture

Articles
How Stone is Reclaiming Structural Authority

Material Intelligence: How Stone is Reclaiming Structural Authority

Articles

Alien Intelligence (AI): Is it time to panic?

Articles

Architect’s Guide to 30 Must-See Landmarks in New York City

City Guide
Previous Next
L’île Folie Pavilion by Marc Fornes/THEVERYMANY

Subscribe to our newsletter

- Advertisement -
Ad image

You Might Also Like

ProjectsArchitecture

Manuelle Gautrand designs an office building with a folded glass facade, resembling Japanese origami

June 28, 2024
Songdo
ArchitectureProjects

LEARNING SKY: Salon Alper Derinbogaz’s Proposal For The New Songdo Library in South Korea

July 1, 2024
ArchitectureProjects

Dance of Sections: The 3D Concrete Printed Architecture

August 5, 2024
ProjectsArchitecture

The future vision for Kemerovo: Museum and Theater Complex by COOP HIMMELB(L)AU

July 31, 2024
PA | Architecture and Technology

© All rights reserved. Parametric Architecture (2018-2026) – ISSN 3023-7564

Parametric Architecture (PA) is a leading global architecture and design platform connecting millions of architects, designers, and students through innovative projects, industry insights, and educational initiatives.

Instagram Facebook X-twitter Youtube Linkedin Pinterest Tiktok

Get in touch​

  • About Us
  • PA+ Membership
  • Contact Us
  • Submit Project
  • NewsLetter
  • Advertise
  • Cookie Policy
  • Distant Sales Agreement
  • PA+ Membership Agreement
  • Privacy Policy

Explore More

  • Articles
  • Projects
  • Videos
  • Books
  • PA Talks
  • Jobs
  • Subscribe

Subscribe Newsletter

Subscribe to our newsletter to get our newest articles instantly!

© 2026 ParametricArchitecture. All Rights Reserved. By utilizing this website, you are consenting to our User Agreement, Privacy Policy, and Cookie Statement. In compliance with the privacy laws of Turkey and the United States, we recognize and respect your rights. Please be aware that we may receive commissions for products bought through our affiliate links. Unauthorized reproduction, distribution, or transmission of any material from this site is strictly forbidden without prior written permission from ParametricArchitecture.

Welcome Back!

Sign in to your account

Username or Email Address
Password


Lost your password?

Not a member? Sign Up